icon_widget_image Monday-Friday: 9am to 5pm icon_widget_image 4505 NE 68th Dr, Vancouver, WA 98661 icon_widget_image + (123) 1234-567-8900 + (123) 1234-567-8901 icon_widget_image jrmerit@jrmerit.com info@jrmeirt.com
Image Alt

Salt River Project Horse Mesa Units 1-3 TSV Retrofit

Salt River Project Horse Mesa Units 1-3 TSV Retrofit

With creative solutions and a dedicated team, we persevered through significant access challenges and natural disasters to successfully remove and replace three 96-inch diameter butterfly TSV valves and the adjacent penstock sections upstream and downstream of each unit. We developed a modular barge transportation system to transfer materials nine miles over water to the access point at the base of the dam and custom-engineered handling and rigging systems to safely transport the valves in the low-ceilinged tunnel. We also overcame schedule impacts from fires, floods, and the COVID-19 pandemic to successfully complete this project.

PROJECT INFO
Location: Apache Junction, AZ
Owner/Client: Salt River Project
Completion: 2020

Project Info