Main navigation

JR MERIT

MENU

Location: Portland, OR
Owner/Client: Portland Bulk Terminals
Completed: 2018

For this project for Portland Bulk Terminals, we fabricated and installed approximately 730 LF of hot-dip galvanized permeable walkway including handrail, toe kick plate, and green fiber grating mounted to the south side of the wharf structure. All work was completed with the use of two barges and aerial lifts.